The Metal Cladding and Roofing Manufacturers Association
Home | Contact Us | Sitemap | Links
MCRMA Construction Details
About the MCRMA Member Companies Technical Papers Construction Details Metal in Action
Verge - Twin Skin

3D Interactive PDF Version Available
Click Diagram To View!
(Requires Free Acrobat Reader 7.0.07 or better)

Click To View 3d Interactive Model

    Key Features
  • Cleader angle required to provide structural support and air sealing between purlins. Joints must be structural, and not interfere with seals. Fasteners securing cleaders to purlins must not interfere with seals.
  • This detail would be expected to have a low thermal bridge effect, provided the liner does not cut across the insulation layer.
  • All fixings and seals must be to manufacturers' recommendations.

  Search
  

Built-Up Systems Details


Composite Panel Systems Details


Download CAD        Download PDF  
 
©2006 MCRMA - 18 Mere Farm Road - Prenton-Wirral - Cheshire CH43 9TT - 0044 (0)151 652 3846 - mcrma@compuserve.com
contact the mcrma | sitemap | privacy statement | terms of service