The Metal Cladding and Roofing Manufacturers Association
Home | Contact Us | Sitemap | Links
MCRMA Construction Details
About the MCRMA Member Companies Technical Papers Construction Details Metal in Action
Parapet Verge - Twin Skin

3D Interactive PDF Version Available
Click Diagram To View!
(Requires Free Acrobat Reader 7.0.07 or better)

Click To View 3d Interactive Model

    Key Features
  • Inner trim is air seal to cladding, so lap joints must be sealed and fixed.
  • Parapet and roof cladding liner must be effectively sealed to the inner trim, using fasteners to compress seal/secure joint as necessary.
  • Roof outer sheet and spacers must terminate approximately in line with parapet outer sheet.
  • Insulation to fill cavity at junction.
  • Verge flashing should fix to outer sheet of parapet cladding, and not cut through the insulation to the liner.
  • Parapet outer sheet/panel has to be rake cut on site. Fit with 10 mm gap to verge flashing.
  • Thermal bridging will be low.

  Search
  

Built-Up Systems Details


Composite Panel Systems Details


Download CAD        Download PDF  
 
©2006 MCRMA - 18 Mere Farm Road - Prenton-Wirral - Cheshire CH43 9TT - 0044 (0)151 652 3846 - mcrma@compuserve.com
contact the mcrma | sitemap | privacy statement | terms of service