The Metal Cladding and Roofing Manufacturers Association
Home | Contact Us | Sitemap | Links
MCRMA Construction Details
About the MCRMA Member Companies Technical Papers Construction Details Metal in Action
Parapet Gutter - Twin Skin

3D Interactive PDF Version Available
Click Diagram To View!
(Requires Free Acrobat Reader 7.0.07 or better)

Click To View 3d Interactive Model

    Key Features
  • Gutter thickness and thermal bridging detail could vary, depending on manufacturer.
  • Ideally, the gutter outer surface should not bridge insulation.
  • Cladding details will minimise bridging due to cladding, no matter what gutter design is used.
  • Liner must be air sealed to gutter legs on both the roof and parapet side.
  • Roof liner must terminate approximately in line with purlin web, to avoid bridging gutter insulation.
  • Insulation must fill to gutter junctions leaving no voids.
  • Flashings must not bridge insulation.

  Search
  

Built-Up Systems Details


Composite Panel Systems Details


Download CAD        Download PDF  
 
©2006 MCRMA - 18 Mere Farm Road - Prenton-Wirral - Cheshire CH43 9TT - 0044 (0)151 652 3846 - mcrma@compuserve.com
contact the mcrma | sitemap | privacy statement | terms of service