The Metal Cladding and Roofing Manufacturers Association
Home | Contact Us | Sitemap | Links
MCRMA Construction Details
About the MCRMA Member Companies Technical Papers Construction Details Metal in Action
Overhanging Eaves - Twin Skin (No Liner Bridge)

3D Interactive PDF Version Available
Click Diagram To View!
(Requires Free Acrobat Reader 7.0.07 or better)

Click To View 3d Interactive Model

    Key Features
  • Detail depends on being able to air seal effectively at stub steelwork and eaves beam. i.e. part of the steel design.
  • There will be thermal bridging through stub, but an alternative would involve insulating soffit, fascia and gutter, and the gutter will probably still be a thermal bridge.

  Search
  

Built-Up Systems Details


Composite Panel Systems Details


Download CAD        Download PDF  
 
©2006 MCRMA - 18 Mere Farm Road - Prenton-Wirral - Cheshire CH43 9TT - 0044 (0)151 652 3846 - mcrma@compuserve.com
contact the mcrma | sitemap | privacy statement | terms of service