The Metal Cladding and Roofing Manufacturers Association
Hip - Composite Panels Construction Details

3D Interactive PDF Version Available
Click Diagram To View!
(Requires Free Acrobat Reader 7.0.07 or better)

Click To View 3d Interactive Model

    Key Features
  • In all cases the building frame must include structural elements running up the angle of the hip to support the edge of the cladding and withstand all load cases.
  • All fixings and seals must be to manufacturers' recommendations.
  • Thermal bridging at hips should be low, similar to ridges.
  • All exposed site cut steel edges should be coated to resist corrosion.
  • All flashing joints to manufacturers' instructions.
  • Details should be provided for the upslope and downslope ends of hips. These are awkward, and usually left to the sheeters on site.

Built-Up Systems Details Composite Panel Systems Details

©2012 MCRMA - 106 Ruskin Avenue, Rogerstone, Newport, South Wales, NP10 0BD - Tel: 01633 895633 - mcrma@compuserve.com

contact the mcrma | sitemap | privacy statement | cookie policy | disclaimer